Challenges Facing Rooftop PV Systems
Where residual roof load capacity is limited, the self-weight of the modules and mounting system must be assessed as a whole.
With many roof types, clamps, rails, and hold-downs in use, the frame must be matched precisely to the mounting system.
Restricted installation space means repeated drilling, adjustment, and rework at height increase both cost and safety risks.
| Category | Technical Parameters | Standard |
|---|---|---|
| Product Name | Rooftop PV Aluminum Frame | Solar Panel Edge Profile |
| Material Grade | 6005 / 6063 Aluminum Alloy | High-Strength Grade |
| Temper | T6 | Heat Treated |
| Technical Standard | GB/T 5237 | Wrought aluminum alloy profiles |
| Tensile Strength | ≥ 255 Mpa | Structural Stability |
| Yield Strength | ≥ 215 Mpa | Load-bearing Capacity |
| Elongation | ≥ 6% | Ductility & Toughness |
| Compatible Module | 182mm * 182mm Solar Cells | Large-Format Modules |
| Frame Dimensions |
2278mm * 1134mm 2382mm* 1134mm Customized Dimension |
Precision Cut (±0.5mm) |
| Surface Finish | Anodized (Silver / Black) | Anti-Corrosion |
| Anodizing Thickness | AA10 / AA12 / AA15 / AA20 | Customizable |
| Black Anodizing Thickness | AA20 / AA25 | Premium UV Resistance |

Lightweighting must be based on structural calculations and module certification; critical load-bearing areas must not simply be thinned.

Prefabricated grounding and mounting holes must match the electrical design and clamping system to avoid arbitrary on-site drilling.

Coordinate drainage holes with the roof slope to reduce standing water, dust accumulation, and frost-heave risks in the slots.
Global 125GW Annual Capacity
Support for Various Length and Cross-section Designs Based on Client Drawings
Export-standard Protective Packaging to Prevent Deformation During Sea Freight
A: No. Lightweighting must remain within the limits of strength, stiffness, connection reliability, and module certification. Critical load-bearing areas must not be thinned arbitrarily.
A: No. Roof waterproofing depends on clamps, rails, penetrations, sealing, and workmanship. The frame only provides the module's perimeter structure and mounting interface.
A: This is not recommended. On-site drilling may affect strength, drainage, grounding, and warranty coverage. Holes should be prefabricated to approved drawings or confirmed by the designer.
Eine Nachricht hinterlassen
Heim
PRODUKTE
Kontakt